Naslov Ekonomski i energetski aspekti Hidroenergetskog sustava Senj 2
Naslov (engleski) Economic and energy aspects of Hydropower system Senj 2
Autor Mladen Džolan
Mentor Nela Vlahinić Lenz (mentor)
Član povjerenstva Saša Žiković (predsjednik povjerenstva)
Član povjerenstva Nela Vlahinić Lenz (član povjerenstva)
Član povjerenstva Mira Dimitrić (član povjerenstva)
Ustanova koja je dodijelila akademski / stručni stupanj Sveučilište u Rijeci Ekonomski fakultet Rijeka
Datum i država obrane 2023-09-18, Hrvatska
Znanstveno / umjetničko područje, polje i grana DRUŠTVENE ZNANOSTI Ekonomija
Sažetak Hidroenergetski sustav Senj 2 najveći je strateški energetski projekt na razini Republike Hrvatske, a realizacijom projekta kroz dvije faze dogradnje Hidroenergetski sustav Senj 2 postat će dio već postojećeg sustava hidroelektrana poddimenzioniranog Hidroenergetskog sustava Senj na rijekama Lika i Gacka, čime bi se povećao udio vršne i regulacijske energije. Investitor projekta, Hrvatska elektroprivreda d.d. najveći je investitor u hidroenergiju i obnovljive izvore energije u Republici Hrvatskoj.
Prva faza dogradnje Hidroenergetskog sustava Senj 2 obuhvaća izgradnju Hidroenergetskog sustava Kosinj: akumulacijsko jezero Kosinj, Hidroelektrana Kosinj i rekonstrukcija Hidroelektrane Sklope, dok druga faza dogradnje obuhvaća izgradnju Hidroelektrane Senj 2: Hidroelektrana Senj 2, kompenzacijski bazen Gusić polje 2 i dovodni sustav od Gusić polja do Hidroelektrane Senj 2. Prva faza dogradnje prema rezultatima proračuna doprinijela bi prosječno godišnje s 232 GWh električne energije, odnosno 22% više električne energije, dok bi druga faza dogradnje doprinijela prosječno godišnje s 92 GWh električne energije, odnosno 7% više električne energije, što zajedno prosječno godišnje iznosi 324 GWh električne energije, odnosno 31% više električne energije u odnosu na postojeće stanje izgrađenosti Hidroenergetskog sustava Senj.
S obzirom na to da je projekt iznimno važan dio energetske politike Republike Hrvatske i da će uvelike doprinijeti energetskoj sigurnosti države u sve zahtjevnijim vremenima, ovaj rad analizira njegov ekonomski i energetski potencijal. Iako je energetski i ekonomski značaj projekta ogroman, on će ipak za posljedicu imati nepovratno promijenjen okoliš velikog prirodnog područja. Također, s obzirom na bitno izmijenjene makroekonomske uvjete, prvenstveno višu inflaciju koja povećava troškove projekta za čak 30%, ovaj rad detaljnije analizira ekonomske i energetske aspekte njegove realizacije. Prema rezultatima ekonomsko-financijske analize, projekt Hidroenergetski sustav Senj 2 isplativ je unatoč izazovima, ali s dužim rokom povrata investicije, dok će u makroekonomskom smislu doprinijeti pozitivnim multiplikativnim učincima za hrvatsko gospodarstvo.
Sažetak (engleski) The Hydropower system Senj 2 is the largest strategic energy project in the Republic of Croatia. With the implementation of the project through two phases of expansion, the Hydropower system Senj 2 will become part of the existing hydroelectric power system of the undersized Hydropower system Senj on the rivers Lika and Gacka, which would increase the share of peak and regulation energy. Project investor, Hrvatska elektroprivreda d.d. is the largest investor in hydropower and renewable energy sources in the Republic of Croatia.
The first phase of the extension of the Hydropower system Senj 2 includes the construction of the Hydropower system Kosinj: the Kosinj reservoir, the Hydroelectric plant Kosinj and the reconstruction of the Hydroelectric power plant Sklope, while the second phase of the extension includes the construction of the Hydroelectric power plant Senj 2: the Hydroelectric power plant Senj 2, the compensation pool Gusić polje 2, the supply system from Gusić polje to the Hydroelectric power plant Senj 2. It is estimated that first phase of the extension would contribute an average of 232 GWh of electricity per year, i.e. 22% more electricity, while the second phase of the extension would contribute an average of 92 GWh of electricity per year, i.e. 7% more electricity, which together the average annual amount is 324 GWh of electricity, that is, 31% more electricity compared to the current state of construction of the Hydropower system Senj.
Given that the project is an extremely important part of the energy policy of the Republic of Croatia and will greatly contribute to the country's energy security in increasingly demanding times, this paper analyzes its economic and energy potential. Although the energy and economic significance of the project is huge, it will have an irreversible impact
on the environment. Also, given the significantly changed macroeconomic conditions, primarily higher inflation that increases project costs by as much as 30%, this paper analyzes in more detail the economic and energy aspects of its realization. According to the results of the economic-financial analysis, the Hydropower system Senj 2 project is profitable despite the challenges, but with a longer investment return period, while in macroeconomic terms it will contribute to positive multiplier effects for the Croatian economy.
Ključne riječi
HES Senj 2
HES Senj
HES Kosinj
HE Senj 2
električna energija
Ključne riječi (engleski)
HES Senj 2
HES Senj
HES Kosinj
HE Senj 2
electrical energy
Jezik hrvatski
URN:NBN urn:nbn:hr:192:146032
Studijski program Naziv: Ekonomija energetskog sektora-MBA Vrsta studija: sveučilišni Stupanj studija: specijalistički Akademski / stručni naziv: specijalist/specijalistica ekonomije energetskog sektora (spec. oec.)
Vrsta resursa Tekst
Način izrade datoteke Izvorno digitalna
Prava pristupa Pristup korisnicima matične ustanove
Uvjeti korištenja
Datum i vrijeme pohrane 2023-11-02 13:18:35